5000 kW 20 KV 50 Hz Boimass Power Plant


Stock #ZW62272

5 MW BIOMASS FUELED POWER PLANT Major Equipment • Production Facilities • Steam boiler 1: 10 MW heat output (12 t / h, 420 ° C, 30/38 bar). An Electrostatic precipitator is connected downstream. • Steam boiler 2: 10 MW heat output (12 t / h, 420 ° C, 30/38 bar). A fabric filter is connected downstream. • Steam boiler 3: oil boiler (6.51 MW, burner controlled to approx. 3 MW) • Turbo-generators Two extraction-condensing turbo-generators # 1: KKK (1.6 MW); Year 1994 # 2: AEG (3.66 MW); 1981; 2008 Total overhauls (All rotating parts revised); Control modernized (automatic start-up and shutdown); Rotary rotation device installed; Oil cooler system modernized. • Flue outlet Suction units per wooden boiler on a chimney 80 m • Water The entire water requirement is covered by a deep well. The facilities consist of; two-stream gravel filter system (drinking water treatment), high tank (220 m³), two-stage softening unit (2 x 18 m³ / h) demineralisation plant. (2 x 1 m³ / h reverse osmosis). • Electrical Voltage level 20 kV; Two feeds to the directly adjacent substation, Turbo-generator Transformers: 1 x 4000 kVA 5,25 / 20 kV 2 x 1600 kVA 0,4 / 20 kV Auxiliary transformer: 630 kVA Emergency Power Generation: 250 kW The operating systems have been retrofitted between 2004 and 2008 to 24 hrs of free operation based on Siemens S7. • Coolers Three fan cooling units (2 x 6.3 MW, 1 x 10 MW) BAC • Sewage Sewage effluents are introduced into a receiving water, • Additional equipment Compressor system for operating air supply Thermal water treatment plant (50 m³ degasser) Heating condenser plant 7 MW • Fuel system Storage space 2000 t storage permit; sliding floor; conveyor belts; magnetic separator; belt scales; 5 h storage tanks with a lower outlet in front of the boilers • Ash disposal Storage space 200 t

Location : EUROPE


Add to Cart Share This